About J&S Construction And Flooring
We will do everything that the customer leads to satisfying and always right. We will leave our way to make them happy. We have been working for 45 years. I have a professional title for Edinburo. I am always here to answer each of the questions. Thank you again and I am waiting for you on working day
We always love Beefar and after our jobs and we would like to see the face of the owners when they also see what we have done and what has been improved.
Area of expertise: pelican installation & repair service, partition installation service, sewer lines and excavation services and more.
- Pelican Installation Plumber
- Partition Installation Plumber
- Sewer Lines Plumber
Services Photos
J&S Construction And Flooring's Plumbing Services
- Pelican Installation & Repair: You need to hire Pelican repair expert from DataXiVi. There are many reasons to contact a Pelican Installation expert in USA for their services.
- Partition Installation: We at DataXiVi understand that partitions installation in office, home or some where else is not a small task, and we will treat it with the seriousness it deserves.
- Sewer Lines and Excavation: We are Sewer Lines service provider with expertise in Sewer Lines and Excavation services for residential and commercial properties in United States.
Contact Information
Address | Burbank, CA - 91502, United States |
Phone Number |
18004273Xxx |
Email Address | j&sconstructionandflooring@dataxivi.com |
Plumber's Map Location
J&S Construction And Flooring FAQ's
1. How is J&S Construction And Flooring overall rated?
J&S Construction And Flooring is rated 5 overall out of 5 based of current 2 Verified Reviews.
2. How many years has J&S Construction And Flooring been in business?
J&S Construction And Flooring has had 13+ years in business.
3. What are J&S Construction And Flooring’s areas of expertise?
- Pelican Installation & Repair Service
- Partition Installation Service
- Sewer Lines and Excavation Service
4. What days and hours are J&S Construction And Flooring open?
J&S Construction And Flooring's opening hours:
- Monday Timing: 11:00 - 18:00
- Tuesday Timing: 11:00 - 18:00
- Wednesday Timing: 11:00 - 18:00
- Thursday Timing: 11:00 - 18:00
- Friday Timing: 11:00 - 18:00
- Saturday Timing: 11:00 - 17:00
- Sunday Timing: 11:00 - 17:00
J&S Construction And Flooring's (Top 2 Verified Reviews)


It cannot be affected more than one generation. Trino immediately re -calls our phone call; When he said he would say; What action was done quickly and clean. Take a very appropriate rate. He gave us a good advice on his organization, when he had no direct interest in parts of the works we advised. The majority, Trino saved us from the disastrous results that could have caused the bad work carried out by the mosaic installation contractor. When they searched the drainage at the end of the installation, they discovered that the floor flash was very installed, except for the drainage below the level of the mosaic. The tile man tried to cover it by applying black rubber joints between the drain coverage and the drainage cover. Treeno found it, it is unacceptable and that the hot water was not eligible in any case and advised us what the tile man should do to complete the work properly. (Trino also referred to some other neglect errors.) The mosaic man is now fixing these errors. We used to replace a pre -existing shower booth with dedicated tiles, and Traino came to the work to work. It has been verified that the current exchange was reaching the code; He has eliminated ancient tappiece handles, and fixed new groups. We have advised whether the mango will be moved and the valve was placed, and we did not decide. After Trino did his job, the tile man reached the tile shower. Next, Trill returned to put the tap handle and a deck panel. He also inspected the new tile space around the exchange, and in that process he discovered dirty mistakes made by the mosaic man in the composition of the mosaic (and tried to cover). Treeno advised us to do to correct the mistakes of another man; Nothing is loaded and left for the trip and examining the return.
Unusual Obstruction